Our Project ShowcaseInnovative Solutions Across Industries
erbil-airport-image
2024
Erbil International Airport (EIA) has extended the concession agreement with Mach Monument Aviation Fueling Company (MMAFCO). MMAFCO must rehabilitate the Storage Tanks, re-design and re-build all other Facilities, build additional Facilities, testing and commissioning and recertify the new fuel farm facilities, owned by EIA, and built in 2007, but was never commissioned post construction. As per the terms of the extended concession agreement, work plan for the rehabilitation and commissioning works shall be submitted to EIA and the full refurbishment of the New Fuel Farm shall be completed and commissioned in 2 years.

Karya Engineering participated as the E&I subcontractor, performing Electrical and Instrumentation engineering and procurement works.
Erbil, Iraq
Erbil International Airport Fuel Farm RehabilitationMach Monument / Havatek
khor-mor-image
2022 - 2025
The Khor Mor KM250 Expansion Project is a major natural gas development undertaken by Pearl Petroleum (Dana Gas & Crescent Petroleum) in the Kurdistan Region of Iraq, increasing the gas processing capacity from 500 to 750 MMSCFD.

Karya Engineering participated in this project as the E&I subcontractor to Havatek Makina A.Ş., contributing to the successful and timely completion of the works.
Kor Mor Region, Sulaymaniyah, Iraq
KM500 Gas Treatment Plant ProjectPearl Petroleum / Havatek
hkn-sarsang-image
2019 - 2022
The HKN Energy, Sarsang Block Wellsite-Based Production Facilities Project, located in the Kurdistan Region of Iraq, was developed to increase crude oil production and processing capacity in the Sarsang field.

Karya Engineering took part in this project as the E&I subcontractor to Havatek A.Ş, successfully executing the Electrical and Instrumentation works and supporting the safe and timely commissioning of the facilities.
Sarsang Region, Northern Iraq
HKN Energy Sarsang Block Wellsite ProductionHKN Energy / Havatek
khabat-power-image
2015 - 2018
The Khabat Thermal Power Plant Project, located near Erbil, is a 2×150 MW power generation facility designed to enhance the region's power supply and grid stability.

Karya Engineering participated as the Low-Voltage and High-Voltage Electrical Subcontractor to Gama Power System, completing all electrical and instrumentation works and supporting successful commissioning.
Khabat, Erbil, Iraq
Khabat Thermal Power PlantM.O.E. / Gama & POSCO
tupras-aliaga-image
2017 - 2018
The Tüpraş Aliağa Refinery U-7000 Revamp Project was undertaken to modernize and improve process efficiency as part of Tüpraş's capacity enhancement program.

Karya Engineering acted as E&I subcontractor, performing all installation and commissioning works in accordance with refinery safety and quality standards.
Aliağa, İzmir, Turkey
Tüpraş Aliağa Refinery U-7000 RevampTüpraş / Havatek
taqa-atrush-image
2015 - 2016
The TAQA Atrush PF-1 Phase 1A Early Production Facilities Project was developed to establish early crude oil production and processing capability in the Atrush Block.

Karya Engineering participated as the E&I subcontractor, performing Electrical and Instrumentation works and supporting the safe start-up and commissioning of the facilities.
Atrush, Duhok, Iraq
TAQA Atrush PF-1 Phase 1A EPFTAQA / Havatek
ttopco-cpf2-image
2015 - 2016
TTOPCO CPF-II Facilities Project was developed to establish crude oil production and processing capability in Koysinjaq, Iraq, delivering a facility capacity of 90,000 bopd.

Karya Engineering participated as the E&I subcontractor, performing Electrical and Instrumentation works and supporting the safe start-up and commissioning of the facilities.
Koysinjaq, Iraq
TTOPCO CPF-II Facilities ProjectTaq Taq Operating Co / Ventech
ttopco-tanker-image
2013 - 2014
The TTOPCO Tanker Loading Station Capacity Upgrading Project was developed to provide an additional 20,000 m³ crude oil storage capacity supplied from the TTOPCO CPF.

Within the scope of this project, Electrical and Instrumentation (E&I) works were carried out for two (2) 10,000 m³ crude oil storage tanks and three (3) crude oil loading bays, including all associated utility systems.

Karya Engineering participated in the project as the E&I subcontractor, undertaking the design, procurement, and installation of all electrical and instrumentation systems, and providing support for the safe start-up and commissioning of the facilities.
Koysinjaq, Iraq
TTOPCO Tanker Loading Station UpgradingTaq Taq Operating Co / Havatek
nainawa-power-image
2012 - 2014
The Nainawa 6×125 MW Power Plant Project was executed to strengthen Iraq's electricity generation capacity through six high-efficiency gas turbine units.

Karya Engineering completed all Electrical and Instrumentation works, contributing to reliable and timely plant commissioning.
Nainawa, Iraq
Nainawa 6x125 MW Power Plant EBOPM.O.E. / Çalık Enerji