Project SummaryErbil International Airport Fuel Farm RehabilitationErbil International Airport (EIA) has extended the concession agreement with Mach Monument Aviation Fueling Company (MMAFCO). MMAFCO must rehabilitate the Storage Tanks, re-design and re-build all other Facilities, build additional Facilities, testing and commissioning and recertify the new fuel farm facilities, owned by EIA, and built in 2007, but was never commissioned post construction. As per the terms of the extended concession agreement, work plan for the rehabilitation and commissioning works shall be submitted to EIA and the full refurbishment of the New Fuel Farm shall be completed and commissioned in 2 years.
Karya Engineering participated as the E&I subcontractor, performing Electrical and Instrumentation engineering and procurement works.
Project Scope
Tank Gauging System
4 x Jet Fuel Storage Tank E&I Works
Replacement of existing pumps, filter water separators, related piping & accessories in the Pump House E&I Works
New Bridger Offloading and Refueler Loading Facilities E&I Works
DCS and ESD System
F&G System
New Office Building / Control Room / Electrical Room with all Electrical, Instrumentation & Control Facilities E&I Works
Services Provided
Engineering
Procurement
|Project Details
Erbil, IraqEngineering and Procurement of E&I WorksEngineering and Procurement of E&I Works for airport fuel infrastructure.