ttopco-tanker-image
Koysinjaq, Iraq
Project SummaryTTOPCO Tanker Loading Station UpgradingThe TTOPCO Tanker Loading Station Capacity Upgrading Project was developed to provide an additional 20,000 m³ crude oil storage capacity supplied from the TTOPCO CPF.

Within the scope of this project, Electrical and Instrumentation (E&I) works were carried out for two (2) 10,000 m³ crude oil storage tanks and three (3) crude oil loading bays, including all associated utility systems.

Karya Engineering participated in the project as the E&I subcontractor, undertaking the design, procurement, and installation of all electrical and instrumentation systems, and providing support for the safe start-up and commissioning of the facilities.
Project Scope
Detail E&I Design and Engineering Works
DCS & ESD, Tanker Loading System Automation Design and Engineering
All Electrical & Instrument Material Procurement
3,000 m Cable Tray Installation
75,000 m Instrument Cable Installation
MV–LV Transformer Substations Installation
35,000 m Electrical Cable Installation
3 Loading Bays with 6 Loading Arms — Full E&I Installation
4×10,000 m³ Crude Oil Tank SIL-3 Tank Gauging System
Services Provided
Engineering
Procurement
Construction
Pre-Commissioning
|Project Details
Koysinjaq, IraqEngineering, Procurement, Installation and Commissioning of E&I WorksUpgrading crude oil storage capacity with additional 20,000 m³.
CLIENT
Taq Taq Operating Co / Havatek
START DATE
April 1, 2013
END DATE
January 1, 2014
DURATION
10Months
COMPLETED MAN HOURS
90,000MH
STATUS
Completed