logo
Home
Corporate
Services
Projects
HSE
Quality
Contact
Careers
welcome-image
Quality AssuranceCommitment to Excellence
Quality PolicyField quality control procedures form a fundamental part of our operations and are embedded in every phase of project execution. In line with the demands of our industry, we adhere strictly to internationally recognized quality standards across all activities, ensuring consistency, traceability, and technical reliability. To achieve full compliance with project specifications and client-specific quality systems, our procedures are systematically aligned with the unique requirements of each project. Through continuous monitoring, documentation, and verification processes, we maintain high levels of performance and reinforce our commitment to delivering dependable, high-quality outcomes.
Quality Assurance ProcessAt Karya Engineering, our quality assurance process is designed to ensure that every project we undertake meets the highest standards of excellence.
Preparation of a Method of Statement (MOS)
>Definition of work execution methodology and sequence
>Identification of resources, tools, and safety controls
>Approval and communication to relevant project teams
Inspection & Test Plan (ITP)
>Establishment of inspection and verification points
>Definition of acceptance criteria and standards
>Coordination with client and third-party inspections
Executing and Monitoring Field Operations
>Implementation of approved procedures on site
>Continuous supervision and quality verification
>Recording of deviations and corrective actions
Inspection & Test Report (ITR)
>Documentation of inspection and test results
>Verification of compliance with specifications
>Archiving records for traceability and handover
Quality Performance MetricsOur quality metrics provide a clear measure of the effectiveness of our quality processes and ensure consistent performance. By tracking key indicators, we monitor compliance, identify areas for improvement, and stay aligned with project requirements. This approach supports continuous improvement and reliable project outcomes.
%93.07First Inspection Approval Rate
3Number of Non Conformance Reports (NCR)(in 976,000 MH Project)
Punch List Closure Times (Days)*Excluding delays resulting from missing project information and/or material shortages.
4,69A Punch
19,85B Punch
24,57C Punch
welcome-image
Full Traceability & Transparent ReportingWe maintain full traceability and transparency throughout our quality processes by ensuring that all activities, inspections, and test results are properly documented and recorded. Structured reporting systems enable clear visibility into project status, compliance, and performance for both internal teams and clients. This disciplined approach supports accountability, facilitates audits and reviews, and strengthens confidence in the integrity and reliability of delivered work.
Comprehensive traceability from project inception to completion
Transparent reporting to clients
Excellent handover to clients
Continuous improvement through documented feedback and lessons learned
Continuous Improvement
Quality is a Journey, Not a DestinationContinuous improvement is embedded in our quality approach through regular performance evaluation, feedback integration, and process refinement. We analyze project outcomes, inspection data, and lessons learned to identify opportunities for optimization. By systematically implementing corrective and preventive actions, we enhance efficiency, strengthen compliance, and maintain consistent quality across all activities.
Our CertificatesOur ISO certifications reflect our commitment to internationally recognized management and quality standards. These certifications demonstrate our dedication to consistent performance, regulatory compliance, and continuous improvement across all operations.
ISO 9001:2015
Reg. No: QMS/1234/5678
"Quality Management Systems"
ISO 45001:2018
Reg. No: OHS/1234/5678
"Occupational Health and Safety Management Systems"
ISO 14001:2015
Reg. No: EMS/1234/5678
"Environmental Management Systems"
© 2025 Karya Engineering. All rights reserved.